Tuesday, 24 August 2010
CASE STUDY: NEW TEACHING BLOCK CAMARTHEN
Walking into the site:
A look at the crane:
One of the units actually being lowered down:
The sumps being built and constructed:
One of the units being loaded onto the truck:
Newer Post
Older Post
Home