Tuesday, 24 August 2010

CASE STUDY: NEW TEACHING BLOCK CAMARTHEN

Walking into the site:







A look at the crane:




One of the units actually being lowered down:




The sumps being built and constructed:







One of the units being loaded onto the truck: