Tuesday, 31 August 2010

DAY 6_DESIGN IN THE HISTORIC ENVIRONMENT - OYSTERMOUTH CASTLE




Oystermouth Castle is a Scheduled Ancient Monument and Grade I listed building located in Oystermouth, Swansea. Together with repairs to the Castle, the project aims to improve the visitor experience through the construction of a new visitor centre.

There are several important opportunities including: conservation and preservation, to ensure long term standing of the castle structure; interpretation and education, providing a stimulating and exciting new entrance building with exhibitions to attract and inform visitors; and prominence, ensuring the new build works to harmonise and respect the existing castle.

The constraints of this project include: the size of the visitor centre, as it needs to be large enough to meet the visitors requirements; and minimising the risk during construction, to avoid damaging the existing building.


The new visitor centre is to be located within the existing chapel. Together with providing visitor facilities it also aims to explain the existing building. One new interesting feature in the design is the new glazed bridge above the ticketing desk and workshop at second floor level. This will be placed where the former aisle to the chapel was located. It is made completely of glass and maximises the natural light to the new visitor centre below. (The section for this can be seen above)

DAY 6_DESIGN IN THE HISTORIC ENVIRONMENT - GILFACH-Y-BERTHOG


The Grade II* Listed house, Gilfach-y-Berthog, is located near Whitemill, Camarthenshire. The clients for this project would like to restore three of the listed buildings that are currently unoccupiable and are at risk, together with providing a new kitchen extension and a swimming pool in a new outhouse.

Through the use of a physical model the practice was able to show how the new buildings could be added to a very sensitive site. The images above show the before and after proposals.


The size and scale of the new buildings are very important. They should not overwhelm the existing listed buildings. The opportunity has been taken to open up the views of the grand frontage of the house on the approach to the property by removing the existing out-buildings, which are currently in front of the house.

The constraints of the project include bats, which are present on the site and within existing buildings, therefore any proposals need to take into account these implications. Also, the new buildings should be constructed to the modern standards of construction, considering factors such as siting and orientation.

A design and access statement accompanied the planning and listed building applications for this property. This
included building and site analysis, opportunities and constraints, the response to objectives of good design (repairs, appearance, layout, access etc.) and the design evolution, along with a range of images and drawings.


Building and Site Analysis includes the information about the history of the building and site, informing the positioning of buildings on site and environmental site analysis. Environmental site analysis refers to the position of the sun throughout the day, views from the property, prevailing wind and the access to and from the property (image above). The approach to the design is informed by the site as much as the clients requirements.

DAY 6_RESTORATION - WEST LODGE/ANIMAL WALL


As part of the Bute Park Restoration Project, the Animal Wall that borders Castle Street is currently being restored. The work involves repairing stone work, cleaning graffiti, re-pointing mortar and repairing the damage to the various animals. Cleaning trials were undertaken on the wall before carrying out the project (below).


It is important that the repairs match the existing walls and great care has been taken to ensure that this is the case. Below is a page from the Schedule of Repairs document that Davies Sutton Architects produced to itemise out the works.


The wall was split into sections within the document to enable the work to be managed. This one shows the Anteater that has lost it's nose and it will now be repaired. To help with this an appeal was made to find old photographs of the Animal Wall with the Anteater's nose still in place.



DAY 6_INVESTIGATING OPTIONS - WEST LODGE/ANIMAL WALL


West Lodge is located in Bute Park, Cardiff and along with the Animal Wall forms the boundary of the park onto Castle Street. As part of a number of projects in the park, the Animal Wall is being restored and the West Lodge is to provide a visitor reception for the park,
toilet facilities and suitable staff accommodation. This will provide a new and sustainable use for an existing Cardiff landmark.

The constraints of the West Lodge project relate to the fact that the existing building isn't big enough to provide the facilities required. Consequently, the building needs to be extended. It must be accessible by park users, however, any proposed extensions are limited due to the boundary walls of the existing property.

A series of different options were looked at before deciding on a preferred solution. These are shown below:




The preferred option was Option 2, which was developed further.

The roof of the new visitor centre will be made out of zinc, as this allows a low pitch to be achieved. Also, rendered panels are to be used in the courtyard, giving a contrast to the stone at West Lodge.

A physical model was made to help explain the scheme to the client. This helps the client see the building from different angles and the effect it will have.




DAY 6_DESIGN IN THE HISTORIC ENVIRONMENT - GALLILEE CHAPEL



Above is a short video showing the proposed construction of a new education centre for Celtic Christian Studies within the existing roofless ruins of the Galilee Chapel. The Galilee Chapel is located in Llantwit Major, Vale of Glamorgan. The space will also be used to exhibit Celtic stones.

The constraints of the project include maintaining the historic character of the building and the archaeology of the site (excavations have to be carried out inside the chapel for new foundations).


The existing historic walls and masonry features are to be retained and cleaned. As you can see from the image above, the roof appears to float above the existing ruined walls. Glazing fills the space between the walls and the roof. This allows the new elements to be distinguished from the old elements, so the ruin can still clearly be seen.


A Design and Access Statement is issued as part of a planning application to clearly and consisely explain the project. This one included the opportunities and constraints of the site, the history of the chapel, the planning policy and the response to objectives of good design (environmental sustainability, accessibility etc.). The statement also included a variety of images of the existing ruin and computerized model (shown above), floorplans and sketches. A physical model was also made to show the client how the building would work. This is shown below:


Friday, 27 August 2010

a few videos



End